Search Papers On This Blog. Just Write The Name Of The Course

Monday 16 May 2011

::: vuaskari.com ::: MGT613 My Paper 17/05/11

Paper was quite easy and almost all paper was from past. i m much happy for securing another A grade.
 
Thanx to VUASKARI TEAM
 

Write down at least three ways of improving reliability of a system. 3 Marks

For what purpose the transportation method is used? 3 Marks

Elaborate some advantages and disadvantages of concurrent engineering? 5 Marks

 

Suppose you want to estimate the time required to perform a certain task by the two employees. One employee's study yielded a mean of 6.4 minutes and standard deviation of 2.1 minutes with 95% confidence Interval. Other employee's study yielded a mean of 2.1 minutes and standard deviation of 6.4 minutes with confidence interval of 95%. Now how many observations you will need if desired maximum error is 10% of sample mean? (z= 1.96) Do both the employees have same number of observations? 5 Marks

 

--
We say, "Be one as Pakistani Nation and grow up for Pakistan's Future". Wish you all the best. Join www.vuaskari.com,
To post to this group, send email to vuaskari_com@googlegroups.com
Visit these groups:
This (Main) Group:http://groups.google.com/group/vuaskari_com?hl=en?hl=en
MIT/MCS Group: http://groups.google.com/group/vu_askarimit?hl=en?hl=en
HRM Group: http://groups.google.com/group/askari_hrm?hl=en?hl=en
Banking Group: http://groups.google.com/group/askari_banking?hl=en?hl=en
Management: https://groups.google.com/group/vuaskari_mgt?hl=en
Marketing: https://groups.google.com/group/vuaskari_mkt?hl=en
MIS Group: http://groups.google.com/group/askari_mis?hl=en

No comments:

Post a Comment